background image

Customer:                                                                         
Address:  

Contact:  
Fault Reported:
Engineer’s Report:  

                                                                                                                                    Hours:
Engineer:  
Parts:  

No.                                     

Vehicle Model:  
Registration Number:  
Speedo Reading:  
Platform Model:  
Platform Serial Number:  
Order Number:  
Invoice Date:  
Job Date:

Qty: Total Cost:

Parts:
Labour:
Sub Total:
VAT:
Total:

Signed:

 

 

 

 

 

 

 

Service Report / Invoice

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

   

 

 

 

 

 

 

   

   

 

 

 

 

 

 

 

 

 

   

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

   

   

 

 

Payment terms strictly 14 days from invoice date. All parts remain the property of PSS until full payment is received.

VAT No: 933893389
Bacs: Lloyds Bank
Sort Code: 30 - 90 - 89 
Account Number: 32491860

 

 

   

 

 

 

 

 

 

 

   

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

Platform Support Services
Unit 6, Arthur Court, Norman Way, Over, Cambridge 
CB24 5AL  Tel: 01954 488100

Email: service@platformsupportservices.co.uk 

Web: www.platformsupportservices.co.uk

  G271025-1

             Plantexpand Ltd

                     Isuzu D-Max

           7 Buckingham Square

          BP73 WUK

          Hurricane Way

                 23,801 mls

        Wickford

                   VTA 135 H

         LU6 3QP

      VTA38M23010

        

                    68396540

                       30/10/25

 

                             27/10/25

 LOLER Examination 

 Travel to site - UKPN - Brunel Way, Highwoods, Colchester, CO4 9QX
 Carry out LOLER examination 
 Lubricate all points
 Carry out full weight & operational check 
 Machine safe to return to service.

 
 

    LOLER

 Geoff Coales

 LOLER examination 

1

 £ 298.00

 

 

 
 

          £    ~

        £ 298.00

    £ 298.00

             £ 59.60

           £ 357.60

Geoff Coales

sample-html.html
background image

Interlock and Electrical Circuits 

A

B

C

1.   PTO/handbrake
2.   Stabiliser Interlock
3.   Boom Interlock
4.   Not stowed LED
5.   Remote stop/start
6.   Emergency operation
7.   Boom outreach
8.   Boom docking limit switch
9.   Stabilisers down LED 
10. Condition and security of wiring
11. Emergency stop controls
12. Boom and stabiliser warning lights
13. Side door interlock
14. Condition and operation of beacons 

Hydraulic cylinder holding valves 

A

B

C

15.   Stabiliser N/S front
16.   Stabiliser O/S front
17.   Stabiliser N/S rear
18.   Stabiliser O/S rear
19.   Base or lower boom
20.   Extension boom
21.   Flyboom or jib pole
22.   Outer of upper boom
23.   Cage levelling and rotation  

Structural condition

A

B

C

24.   Slew ring gear and drive
25.   Base or lower boom
26.   Extension boom
27.   Fly boom or jib pole
28.   Outer or upper boom
29.   Insulated sections
30.   Cage, cage mounting and handrail

Comments:

Engineer:                                                           Signed:                                                                CAP Cert No:

Hydraulic system

A

B

C

31.   Operating pressure stabs
32.   Operating pressure booms
33.   Hoses, condition and leaks

37.   Speed control
38.   Condition of hydraulic oil and filter

Pivot pins and chains

A

B

C

39.   Stabilisers
40.   Turret to boom upper/lower
41.   Extension boom
42.   Flyboom
43.   Cage levelling linkage
44.   Compensator
45.   Outer boom knuckle
46.   Chains

Pivot pins and chains

A

B

C

47.   Power tools and outlets
48.   Tilt
49.   Location and condition of docking
50.   Boom wear pads
51.   Chassis and subframe
52.   General condition
53.   Condition and placement of decals
54.   Operator’s manual

Yes

No

Proof test load of                       kgs applied

Examination Address:                                                                          Platform Model:                                                  SWL: 

PLATFORM S/No: 
Vehicle Reg No: 
Date of last Thorough Examination: 
Date of this Thorough Examination:

Document  No.                                     
Intermediate Examination 
6 Monthly Thorough Examination Report

Platform Support Services 

Unit 6, Arthur Court, Norman Way, Over, Cambridge, CB24 5AL

A = Satisfactory  B = Attention Needed 

C = Immediate Attention needed

36.  Control valve - boom control lower

35.  Control valve - boom control upper

34.  Control valve - stabiliser

 

 

Tel: 01954 488100

www.platformsupportservices.co.uk

  G271025-1

         VTA 135 H

  240 KG

 UKPN

  VTA38M23010

 Brunel Way

     BP73 WUK

 Colchester

   30/05/25

 CO4 9QX

   27/10/25


240

 As per main report.

                      

  Geoff Coales

         483



























N/A

Geoff Coales

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

sample-html.html
background image

Manufacturer                                                                    Model
Serial No.

Vehicle Registration No.

Date of manufacturer

Safe Working Load

Date  of  Previous  Inspection                                                                    

Date  of  Thorough  Examination                                                                    

Date this certificate expires

Address at which Thorough  

Examination was made:                                                                    

Address  of  Platform  Owner:                                                                    

Certificate Ref. No.

IN ACCORDANCE WITH LOLER REGULATION. SECTION 9.

Certificate of 

Thorough Examination

Platform  

Support Services 

Unit 6, Arthur Court,  

Norman Way, Over,  

Cambridge,  

CB24 5AL

Declaration

 

 

  

Examination report Findings (tick one only)

This is a new machine and has been thoroughly examined

The machine is in a suitable condition to be returned to service

This machine can be returned to service, but the defects identified in  
the inspection report MUST be rectified before: .................................

Signature of Competent Person

Printed name of Competent Person

CAP No.

 

 

.......................................................................

.......................................................................

I have received appropriate training in the examination of lifting equipment and have been
authorised
 by Platform Support Services, as an employee, to conduct such examinations 
on their behalf. I have examined this equipment in line with the appropriate provision and
current
 legislation and the above particulars are correct.

Tel: 01954 488100

www.platformsupportservices.co.uk

    G271025-1

                         Versalift 

                                     VTA 135 H

                           VTA38M23010

        BP73 WUK

           12/12/23

                   240 KG

UKPN
Brunel Way
Highwoods
Colchester
CO4 9QX

UK Power Networks 
237 Newington House
Southwark Bridge Road
London
SE1 6NP

 

30/05/25

27/10/25

26/04/26

  Geoff Coales

 483

Geoff Coales